top of page
Search

Update on Whitehouse

May 16, 2025
1 min read

Recently staff identified that the outside wall and floor, adjacent to the fireplace in the Utilities Office, had separated indicative of structural support issue. Two weeks ago we hired Belt Engineering to have a structural review conducted of the Whitehouse. Last week we received the report and today met with the Engineer. The good news is the structural supports for the Whitehouse are good! The support for the chimney (facing the North parking lot) has settle and requires additional support which will level the area described above. Portions of the exterior decking will require replacing perimeter boards which have been damaged from old termite infestation. The Engineer stated for being a structure that is 169 years old he found building to be in good condition. The Board is in the process of obtaining bids to repair the areas mentioned above. I will update the residents as this project moves forward.


Joe Snell

 
 
 

Recent Posts

See All
Honoring Veterans Day

As we celebrate Veterans Day, our community comes together to recognize and honor the veterans who have served our country with courage and distinction. We are fortunate to have many veterans living w

 
 
 
Board Agenda Error - October

At the October Board meeting the Board approved the Election Search/Nomination Committee. This was done in error as the committee is to be created at the Board meeting 90 days in advance of the Annua

 
 
 
Thank you

Want to Thank the Edmonds for allowing us to use their electrical power to operate the irrigation controller on Hole 6 due to an electrical failure in the line.

 
 
 

Comments


bottom of page