top of page
Search

Cohen Dr. Storm Water Drainage Issue

The Storm Drain on Cohen Dr. near Cayman Cir. will be repaired by April 21, 2024. The drain requires a new drain box to be installed as the old box collapsed. This issue was identified in November of 2021 and contractor quote was accepted at the May 2022 Board Meeting. This January 2024 the contractor finally began the work. The original approved cost in 2021 was $6,264.00 to tie the pipes together. When the area was excavated (January 2024) the pipes could not be tied together and a drain box is required increasing the cost to $11,287.00.


 
 
 

Recent Posts

See All
Co-Op BOD Meeting Summary for February 26, 2026

New Business 1. Board approved to sell a Co-Op Share (was previously a lease) for $35,000 located at 3541 Blossom Circle Board approved to renew the militance contract to ACR Refrigeration for $2,590.

 
 
 
Co-Op BOD Meeting Summary January 22, 2026

Board approved the installation of recessed lighting for the Community Room. The lighting will be operated via dimmer switches and provide limiting lighting for evening events when full lighting is n

 
 
 

Comments


bottom of page